Case Study Office Renovation Using EPS Cement Sandwich Panel In 3 Weeks

Case Study Office Renovation Using EPS Cement Sandwich Panel In 3 Weeks

A recent 1200 square meter office renovation project for a tech startup in Wuhan demonstrates exactly how powerful EPS Cement Sandwich Panel is for fast commercial upgrades. The company needed to completely reconfigure their old outdated office layout to add 40 new workstations, 5 new meeting rooms and a large shared employee break area, and they only had a 3 week window to finish all work before their new team members arrived. The construction team chose 100mm EPS Cement Sandwich Panel for all internal partitions, and started installation right after removing the old walls. Two teams of four workers finished installing all 320 square meters of new partition walls in just 5 days, and then the electricians and painters could start their work immediately without waiting for plaster to cure. The full project was completed in exactly 21 days, which was 70 percent faster than the original timeline that had been planned using traditional aerated concrete blocks. The total labor cost for the project came in 42 percent under budget, and the team gained an extra 12 square meters of usable floor space that they did not expect, which they used to add an extra small quiet focus room for employees. The startup employees reported that the new office had far less noise transfer between meeting rooms, and the consistent indoor temperature reduced their monthly summer cooling bill by almost 35 percent.

Leave a Reply